Everything about Airbus A350 totally explained
The
Airbus A350 is a long range, mid-sized,
wide-body family of
airliners currently under development, designed to compete with the
Boeing 777 and
Boeing 787. The A350 will be the first Airbus with
fuselage and wing structures made primarily of
carbon fiber reinforced plastic. It is scheduled to enter into service in
2013.
Development
Early designs
When
Boeing announced its
787 Dreamliner project, it claimed the lower operating costs of this airplane would make it a serious threat to the
Airbus A330. Publicly,
Airbus initially rejected this claim, stating that the 787 was itself just a reaction to the A330, and that no response was needed to the 787.
The airlines pushed Airbus to provide a competitor, as Boeing had committed the 787 to have 20% lower fuel consumption than today's equivalent types. Initially Airbus proposed a simple derivative of the A330, unofficially dubbed the 'A330-200Lite', with improved aerodynamics and engines similar to those on the 787. The airlines were not satisfied and Airbus committed €4 billion to a new design to be called the A350. The original version of the A350 superficially resembled the A330 due to its common
fuselage cross-section and assembly. A new wing, engines and a
horizontal stabilizer were to be coupled with new
composite materials and production methods applied to the fuselage to make the A350 an almost all-new aircraft.
On
16 September 2004, then Airbus president and CEO
Noël Forgeard confirmed that a new project was under consideration, but didn't give a project name, and wouldn't state whether it would be an entirely new design or a modification of an existing product. Forgeard indicated that Airbus would finalise its concept by the end of 2004, begin consulting with airlines in early 2005, and aim to launch the new development programme at the end of that year.
On
10 December 2004 the boards of
EADS and
BAE Systems, then the shareholders of Airbus, gave Airbus an "authorisation to offer (ATO)", and formally named it the A350.
On
6 October 2005 full industrial launch of the program was announced with an estimated development cost of around € 3.5 billion. This version of the A350 was planned to be a 250–300-seat twin-engined
wide-body aircraft derived from the design of the existing
A330. Under this plan, the A350 would have modified wings and new engines while sharing the same fuselage cross-section as its predecessor. Controversially, the fuselage was to consist primarily of
Al-Li, rather than the
CFRP fuselage on the 787. It was to see entry into service in 2010 in two versions; the A350-800 capable of flying 8,800
nautical miles (16,300 km) with typical passenger capacity of 253 in 3-class configuration and the 300-seat (3-class) A350-900 with 7,500 nautical mile (13,890 km) range. It was designed to be a direct competitor to the
787-9, and
777-200ER.
Almost immediately Airbus faced criticism on the A350 project by the heads of two of its largest customers,
ILFC and
GECAS. On
28 March 2006, in the presence of hundreds of top airline executives,
Steven F. Udvar-Hazy, of ILFC lambasted Airbus' strategy in bringing to market what they saw as "a Band-aid reaction to the 787," a sentiment which was echoed by GECAS president
Henry Hubschman. Udvar-Hazy called on Airbus to bring a clean-sheet design to the table, or risk losing most of the market to Boeing.
Several days later, similar comments were made by
Chew Choon Seng,
CEO of
Singapore Airlines. Chew stated, "having gone to the trouble of designing a new wing, tail, cockpit" and adding advanced new materials, Airbus "should have gone the whole hog and designed a new fuselage." At the time, Singapore was reviewing bids for the 787 and A350.
Airbus responded by stating it was considering improvements for the A350 to satisfy customer demands. At the same time, Airbus then-CEO
Gustav Humbert suggested that there would be no quick fixes, stating, "Our strategy isn't driven by the needs of the next one or two campaigns, but rather by a long-term view of the market and our ability to deliver on our promises."
On
14 June 2006, Singapore Airlines announced it had selected the 787 over the A350, ordering 20
787-9s.
Emirates Airline decided against making an order for the initial version of the A350 because of weaknesses in the design.
XWB
As a result of these criticisms, in mid-2006 Airbus undertook a major review of the A350 concept. The proposed new A350 was to become more of a competitor to the larger
Boeing 777 as well as some models of the
Boeing 787, with a larger fuselage cross-section able to accommodate 9 passengers per row in economy class. The A330 and previous iterations of the A350 would only be able to accommodate 8 passengers per row in normal configurations. The 787 can accommodate 8 or 9 passengers per row, while the 777 can accommodate 9 passengers per row (in a small percentage of their 777 fleet, these airlines seat 10 passengers abreast: British Airways, Emirates, KLM, and China Southern). From the point of view of a seated passenger, the A350 cabin is 13 cm (five inches) wider at eye level than the competing
Boeing 787, and 28 cm (eleven inches) narrower than the
Boeing 777, its other competitor. All A350 passenger models will have a range of at least 8,000
nautical miles (15,000 km).
There was some speculation that the revised aircraft would be called the Airbus A370 or A280, with Airbus going as far as accidentally publishing an advert referring to the aircraft as the "A280" on the
Financial Times website. However, on
17 July 2006, at the
Farnborough Air Show, Airbus announced that the redesigned aircraft would be called
A350 XWB (Xtra Wide-Body).
Airbus achieved its first sale of the redesigned A350 four days after its unveiling when
Singapore Airlines announced an order for 20 A350 XWBs with options of a further 20. Its CEO,
Chew Choon Seng, said in a statement, that "it is heartening that Airbus has listened to customer airlines and has come up with a totally new design for the A350."
Late in 2006 a decision on formal launch was delayed as a result of delays of the
Airbus A380 and wrangles about how the development would be funded. EADS CEO
Thomas Enders stated that the A350 program wasn't a certainty, citing EADS/Airbus' stretched resources. On
1 December 2006 the EADS board agreed the
industrial launch of the sixth iteration A350 with costs mainly borne out of cash-flow. First delivery for the -900 is scheduled for mid-2013, with the -800 and -1000 following on, respectively, 12 and 24 months later. At a press conference
4 December 2006 a few new technical details of the A350 XWB design were revealed, but no new customers were identified and
John Leahy indicated existing A350 contracts were under re-negotiation due to increases in prices compared to the original A350s contracted.
On
4 January 2007, Airbus announced that
Pegasus Aviation Finance Company had placed the first firm order for the A350 XWB with an order for two aircraft, though the variants were unspecified at the time.
The Airbus board of directors approved the industrial launch of the A350-800, -900 and -1000 in December 2006. The XWB will impose a couple of years of delay into the original timetable and almost double development costs from $5.3 billion to approximately $10 billion.
During
2007 Paris Air Show, Airbus won firm orders for 141 A350 XWB and at the
Dubai Airshow it won firm orders for 165 A350 XWB.
Design
On September 2007, Airbus rolled out new design advances to a gathering of 100 representatives from existing and potential XWB customers. The A350 XWB will be built on the technologies developed for
Airbus A380 and will have a similar cockpit and
fly-by-wire systems layout. Airbus claim that 52% of the aircraft will be made out of
composites, 20%
Al/Al-Li, 14%
titanium, 7%
steel and 7% the balance. October 2008 is the Airbus internal goal to freeze the design and Airbus expects 10% lower airframe maintenance cost and 14% lower empty seat weight than competing aircraft.
Airbus claims that the new design provides a better cabin atmosphere with 16% humidity level during flight cruise and typical cabin altitude at or below 6000 ft, pressurization at and flow management system that adapts cabin airflow to passenger load with draft-free air circulation.
Fuselage
The new XWB fuselage will have a parallel
cross-section width from door 1 to door 4, unlike previous Airbus aircraft to provide maximum usable volume. The double-lobe (
ovoid) fuselage cross-section will have a maximum outer
diameter of 5.97 m (compared to 5.64 m for the A330/A340). The cabin's internal diameter will be 5.61 m wide at armrest level (compared with 5.49 m of the 787 and 5.86 m of the
777).
In the eight abreast two-four-two arrangement, which is a standard layout, the seats will be 19.5 in (49.5 cm) wide between 2-in wide arm rests. Airbus claims that the seat width will be 0.5 in greater than the seat on the 787 in the equivalent configuration. In the nine abreast, three-three-three high density layout, the XWB's seat width will be 17.7 in which will be 0.5 in wider to the proposed equivalent seat layout for the Boeing 787.
Airbus confirmed in early September 2007 the adoption of composite fuselage frames for the aircraft structure. The composite frames will feature aluminium strips to ensure the electrical continuity of the fuselage (for dissipating lightning strikes.) However, the fuselage crossbeams remain metallic, but Airbus is running trade-off studies to evaluate switching them to composite. The new design differs slightly from the 787 design which uses ovoid skin
barrels on titanium ribs.
Airbus had signed a firm contract with
BMW to have them develop an interior concept for the original A350.
Wings
The A350 will feature new all-composite wings that will be common to all three proposed variants. With an area of 443 m² (4,740 ft²) it'll be the largest wing ever produced for a single-deck widebody aircraft. The geometric
wingspan of 64 m (210 ft) is 3.7 m greater than that of the A330 and the original A350. The current biggest twinjet wing belongs to the long-range Boeings
777-200LR/777-300ER, which have 0.7 m greater span but slightly less area. The new wing will have 35 degrees of
sweep (5 degrees more than the A330) helping to increase typical cruise speed to
Mach 0.85 and maximum operating speed to Mach 0.89.
Airbus is currently working on the detail of the wings'
aerodynamics and it won't freeze the final configuration until the October 2008 design freeze milestone. A new trailing-edge
high-lift system has been adopted with an advanced dropped hinge
flap (similar to that of the A380) which permits the gap between the trailing edge and the flap to be closed with the
spoiler. The manufacturer has carried out 1800 hours of low-speed
windtunnel testing and results have led to a slight reduction of the static engine's
thrust due to a better low-speed performance than anticipated. High-speed performance testing has begun at the European
Transonic Windtunnel in
Cologne, Germany and a final decision regarding winglet configuration is expected soon.
Airbus is planning a £570 million (US$760 million) investment to upgrade composite capability at its
Broughton site in the United Kingdom, in preparation for its role as final assembly location for the A350 XWB wing.
Nose
The XWB's nose section will adopt a configuration derived from the A380 with a forward-mounted nosegear bay and a six-panel flightdeck windscreen. This differs from the dramatic four-window arrangement that was proposed in the original design. The new nose will improve aerodynamics and enable overhead crew rest installed further forward and eliminate any encroachment in the passenger cabin. The new windscreen has been revised to improve vision by reducing the width of the center post. The upper shell radius of the nose section has been increased.
The nose is likely to be constructed from aluminium but Airbus is currently running trade-off studies considering one-piece carbon fiber structure. According to
Gordon McConnell, A350 Chief Engineer, a carbon fiber structure would need titanium reinforcements for birdstrike protection, thus the aluminium structure is the best cost-wise.
Cockpit
The new revised design of the
cockpit have gone away from the A380-sized display and have adopted a 15-
in (38 cm)
LCD displays. The new six-screen configuration will have two
central displays mounted one above other (the lower one above the thrust levers) and a single (for each pilot) primary flight/navigation display with an on-board information system screen adjacent to it. Airbus claim the new cockpit will allow them to put more advances in navigation technology on the displays in the future plus flexibility and capacity to upload new software and to combine data from multiple sources and sensors for flight management and aircraft systems control. The A350 XWB will also feature a
head-up display.
The
avionics will be a further development of the
integrated modular avionics (IMA) concept found on the A380. The A350's IMA will manage up to 40 functions (versus 23 functions for the A380) such as landing gear, fuel, brakes, pneumatics, oxygen system, full cabin pressurisation system and fire detection. Airbus claims benefits such as reduced maintenance and less weight because IMA replace multiple processors and LRUs with around 50% fewer standard computer modules known as line replaceable modules. The IMA runs on a 100
Mbit/s network based on the avionics full-duplex (
AFDX) standard, already employed in the A380 instead of the
Arinc 429 system on the A330/A340.
On January 2008, French-based
Thales Group won the US$2.9 billion 20-year contract to supply avionics and navigation equipment for the A350 XWB. Thales had been competing against
Honeywell and
Rockwell Collins for the flight deck supply contract.. However, US-based
Rockwell Collins and
Moog Inc has been choosen to supply the horizontal stabiliser actuator and primary flight control actuation, respectively.
Engines
Airbus has confirmed that that'll retain a full
bleed air system on their
engines, rather than the bleedless configuration used on the Boeing 787.
Rolls-Royce has agreed with Airbus to supply a new variant of the
Trent engine for the A350 XWB, currently called the
Trent XWB. After the low-speed windtunnel test, Airbus has frozen the static thrust at sea level for all three proposed variants in the 74,000-92,000
lb range.
GE has stated it won't offer the
GP7000 on the aircraft, and that previous contracts for the
GEnx on the original A350 didn't apply to the XWB. Fellow
Engine Alliance partner
Pratt & Whitney seems to be at odds with GE on this, publicly stating that they're looking at an advanced derivative of the GP7000.
In April 2007, Airbus former chief executive Louis Gallois held face-to-face talks with senior
General Electric management over finalizing the possible go-ahead of a new variant of the GEnx engine for the A350 XWB. Airline pressure for a GE engine option is believed to be coming particularly from
US Airways and
Singapore Airlines, as well as others within the
A350 orders group that either originally selected GE or that have not yet settled for the Rolls-Royce Trent XWB-powered option. But on June 2007, Rolls-Royce announced that it had signed its biggest ever contract with
Qatar Airways for the Trent XWB to power 80 A350 XWBs on order from Airbus worth $5.6 billion at list prices and in June 2007, Airbus' Chief Operating Officer
John Leahy indicated that the GEnx engine won't feature on the A350 XWB, claiming that Airbus wants GE to offer a more efficient version for the new Airbus airliner. Since then, largest GE engines operators
Emirates,
Singapore Airlines, US-based
US Airways,
Hawaiian Airlines and
ILFC have selected the RR Trent XWB for their future fleet of A350.
The
Trent XWB will feature a 118 in (3 m)
fan diameter and the design will be based on the advanced developments of the
Trent 900 (Airbus A380) and
Trent 1000 (Boeing 787). The
Trent XWB may also benefit from the next-generation reduced acoustic mode scattering engine duct system (RAMSES), which is a noise-dampening engine nacelle intake and a carry on design of the Airbus's "zero splice" intake liner developed for the A380.
Engine thrust-reversers and nacelles will be supplied by US-based
Goodrich Corporation.
APU and Air Management System
The A350 XWB will feature a 1,700
shp HGT1700
auxiliary power unit by
Honeywell, which has 10% greater power density than the previous generation of the Honeywell's 331 APU family. Honeywell will also supply the air management system which comprise the bleed air, environmental control, cabin pressure control and supplemental cooling systems. The
ram-air turbine will be now localized on the belly and the generator requirement is 100
kVA compared to 150 kVA for the A380. The selection of US-based Honeywell supplier is part of Airbus strategy to select complete work packages to a smaller number of major suppliers who are becoming system integrators on the programme.
Fuel and Hydraulic Systems
US-based
Parker Aerospace has been selected to supply the complete fuel package, which include inerting system, fuel measurement and management systems, mechanical equipment and fuel pumps. The fuel tank inerting system will feature air-separation modules to generate nitrogen-enriched air that will be used to reduce the flammability of fuel vapour in the tanks.
The company will also provide hydraulic power generation and distribution system. The work packages cover the reservoirs, manifolds, accumulators, thermal control, isolation, software and a new engine- and electric motor-driven pump designs. Parker Aerospace estimates the contracts will generate more than US$2 billion in revenues over the life of the programme.
Landing gear
Airbus has adopted a completely new philosophy for the attachment of the A350 XWB’s main
landing gear as part of the switch to a composite wing structure. Each XWB's main landing gear leg is going to be attached to the rear wing spar forward and to a gear beam aft, which itself is attached to the wing and the fuselage. To help reduce the loads further into the wing, a double side-stay configuration has been adopted. This solution resembles the design of the
Vickers VC10.
Airbus devised a three-pronged main landing gear design philosophy encompassing both four- and six-wheel bogies to ensure it can keep the pavement loading within limits. The A350-800 and A350-900 will both have four-wheel bogies, although the -800's will be slightly shorter to save weight. Both will fit in the same 4.1 m (13.5 ft) long bay. The proposed higher weight variant, the A350-1000, A350-900R (Airbus is offering
BA a variant called the A350-900R, which will have a range of about 9,400 nautical miles. This would allow the airline to schedule direct Heathrow-to-Sydney flights.) and A350-900F will used a six-wheel bogey and a 4.7 m landing gear bay. French-based
Messier-Dowty has been confirmed to be providing the main landing gear for the new XWB. The nose gear will be supplied by
Liebherr-Aerospace.
Variants
There are three variants of the A350 and all launched in 2006. The A350-900 will enter service in 2013. The A350-800 will enter service in 2014. The last to enter service will be the A350-1000 in 2015.
A350-800
The A350-800 will seat 270 passengers in a 3-class cabin and will have a range of 8,300
nmi (15,400 km). To January 2008, Airbus has officially announced via press release 159 orders and commitments for the A350-800.
A350-900
The A350-900 is the first to enter service (EIS) in 2013 and seats 314 passengers in a 3-class cabin 9-abreast layout. The aeroplane will have a range of 8,100 nmi (15,000 km). Airbus claim that the A350-900 will have a decrease of 16%
MWE per seat, a 30% decrease in block fuel per seat and 25% better cash operating cost against the Boeing
777-200ER. A -900R and -900F variant also is being proposed but not launched yet and will feature the higher engine thrust, strengthened structure and landing gear of the -1000. In January 2008, Airbus officially announced via press release 217 orders and commitments for the A350-900.
A350-1000
The A350-1000 will enter service in 2015. It is the largest variant of the A350 family and will seat 350 passengers in a 3-class cabin. It will have range of 8,000 nmi (14,800 km). In January 2008, Airbus has officially announced via press release 40 firm orders for the A350-1000.
Orders and deliveries
This plane hasn't yet entered service. However, numerous companies have placed orders on the aircraft.
Specifications
| Model |
A350-800 |
A350-900 |
A350-1000 |
| Cockpit Crew |
Two |
| Passengers |
270 3-class 312 2-class |
314 3-class 366 2-class |
350 3-class 412 2-class |
| Length |
60.5 m (198 ft 6 in) |
66.8 m (219 ft 3 in) |
73.8 m (242 ft 3 in) |
| Wingspan |
64 m (209 ft 10 in) |
| Wing Area |
440 m² (4,740 ft²) |
| Wing sweepback |
35° |
| Height |
16.9 m (55 ft 5 in) |
| Fuselage Diameter |
5.94 m (19 ft 5 in) |
| Cabin Width |
5.61 m (18 ft 5) in |
| Cargo Capacity |
26 LD3 |
36 LD3 |
44 LD3 |
| Maximum Takeoff Weight |
|
|
|
| Cruise Speed |
Mach 0.85 (903 km/h, 561 mph, 487 knots, at 40,000 ft/12.19 km) |
| Maximum Cruise Speed |
Mach 0.89 (945 km/h, 587 mph, 510 knots, at 40,000 ft/12.19 km) |
| Range, Loaded |
|
|
|
| Maximum Fuel Capacity |
|
| Service Ceiling |
|
| Engines (2×) |
RR Trent XWB |
| Maximum Thrust Capability |
|
|
|
Further Information
Get more info on 'Airbus A350'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://airbus_a350.totallyexplained.com">Airbus A350 Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |